Commissioning

Commissioning Services

We cover all aspects of electrical testing and commissioning to get your wind project online and generating energy as efficiently as possible.
​Tests include (but not limited to);

  • Internal cabling and fit out
  • Assisted with commissioning and SIMS works
  • Primary Plant Tests
  • HV Circuit Breakers
  • Insulation Resistance
  • Contact Resistance
  • Timing
  • Reduced Voltage Operation
  • Interlocks and functional tests
  • Current Transformers 
  • Insulation Resistance​
  • Panel general items
  • Check components & ratings
  • Record Equipment details & serial numbers
  • Check panel labeling 
  • Point to Point wiring checks
  • Burden Check
  • Voltage Transformers
  • Insulation Resistance
  • Winding Resistance
  • Single Point Earth
  • Ratio & amp; Polarity
  • Burden Check
  • Connected Circuitry Phasing Checks
  • Winding Resistance
  • Single Point Earth
  • Ratio & Polarity
  • Mag Curve
Picture

Secondary Protection Tests

  • Panel general items
  • Check components & ratings
  • Record Equipment details & serial numbers
  • Check panel labeling 
  • Point to Point wiring checks​
  • Terminal tightness check 
  • Functional Testing
  • Panel Heaters 
  • Protection Relays (SEL 751, SEL 700G, MFAC 34 etc)
  • Test relays via secondary injection to prove correct element and logic configuration
Picture

HV Bus Testing

  • Insulation Resistance (Pre & post HV withstand)
  • ​​Ductor Connections
  • ​Hi-Pot HV Withstand
  • ​​Primary Injection tests to prove Bus Zone protection stability
  • ​HV Cables 
  • ​Sheath Test
  • ​Insulation Resistance (Pre & post HV withstand)
  • ​VLF HV withstand
  • ​Phasing Checks
  • ​Earth Switches
  • Contact Resistance
​
  • Interlocks and functional checks
  • Power Transformers 
  • Insulation Resistance
  • Winding Resistance 
  • Ratio, Polarity & amp; Phase Relationship 
  • Check Oil Levels, Valves, Pipework, Paintwork
  • Function check of Temperature Alarms/Trips, Buchholz, PRD etc.
  • Primary Injection to prove Differential Scheme stability 
  • Site Earthing System
  • Full HV system earthing test including step/touch, earth grid impedance, mesh voltages and EPR.​
​
​
1300 534 110                                                                                                                                                                                               © COPYRIGHT 2024. ALL RIGHTS RESERVED
                                                                                                                                                                                                                                                                                                                              ISLAND ENERGY WIND ABN  42672785689 .
  • Home
  • Services
    • Power Generation
    • Construction Wiring
    • Commissioning
    • Island Energy Wind - Maintenance
  • Contact